Purpose of this paper as a historical record
Many people know the Building Act 1993 as an operating statute, but far fewer know why its central features were conceived and why they were designed to operate together. More than thirty years have passed since the reform. Many of those who worked on the project have retired, some many years ago, and the corporate and institutional memory is diminishing. One purpose of this paper is therefore to preserve for historians and future readers a first-hand account of the philosophy and intentions that underpinned the Act while that recollection can still be recorded.
This account is informed by direct involvement in the reform. The writer served as Project Director of the National Model Building Act project and as an instructing officer to Parliamentary Counsel in the development of the Building Act 1993. He is also a former Chair of the Victorian Building Practitioners Board.
Introduction
The Building Act 1993 was one of the most important changes to Victorian building control in the modern era. It did much more than replace one statute with another. It changed the way building approvals were delivered, the way practitioners entered the industry, the way responsibility was allocated and the way long-term liability was managed.[1]
To understand the Act properly, it is not enough to read each provision separately. The key is to understand the philosophy that connected the provisions. Private certification, practitioner registration, mandatory insurance, proportionate liability, the ten-year liability period and mandatory inspections were not unrelated reforms. They were designed to work together.
This paper is confined to that original philosophy and architecture. It asks why the Act was created and what its designers intended the reforms to accomplish. It does not treat the original intention as proof that every part of the system later operated as intended. Nor does it examine later court decisions, regulatory reviews or institutional changes.
1. Why reform was considered necessary
In the period before the Act, building permits and inspections were principally administered by local councils. A person wishing to build generally depended upon the municipal system for approval. The council appointed and controlled the municipal building surveyor, and there was no competing private pathway for the issue of a building permit.
The concern was not that councils had no proper role. The concern was that a single approval channel produced delay and delay related cost. Permit delays could hold up finance, labour, materials and construction. Different approaches between municipalities and between States also made it harder for practitioners and businesses to operate across a national market.[2]
From the perspective of those developing the reform, the delay was not an abstract policy concern. There were building permit applications that took months to determine. Every additional week could affect finance, contractual programs, trades and material delivery.
One of the practical ambitions of the reform was therefore to remove the applicant’s complete dependence upon a single council approval channel and materially accelerate permit turnaround.
Author’s recollection: In seeking a building permit from a local council, I encountered firsthand the practical limitations of the former system, including the restricted hours during which the relevant council office was open to the public: 10.00 am to midday and 2.00 pm to 4.00 pm. The process left applicants with the distinct impression that they were expected not to inconvenience the council, rather than that the council was expected to provide a convenient service to permit applicants. The encounter was modest, but it brought the larger problem into sharp focus: applicants depended on a single municipal channel and had to organise the permit process around the authority’s limited availability.
The early 1990s were a period of major microeconomic reform. Governments were looking for ways to make regulatory systems faster, more consistent and more responsive while preserving public safeguards. Building regulation became part of that wider reform movement.[3]
2. The national model behind the Victorian Act
The immediate intellectual foundation for the Victorian Act was the model building legislation commissioned in 1990 by the Australian Uniform Building Regulations Co-ordinating Council, the predecessor of the Australian Building Codes Board.
The mandate was to produce a best-practice legislative model for consideration by the States and Territories. The model was designed to support a more nationally consistent building market and to introduce a modern form of building control. Victoria adopted many of its central ideas in the Building Act 1993.[4]
The national model did not proceed from the belief that regulation should simply disappear. Its philosophy was more exact. Regulatory functions could be opened to private delivery, but the people performing those functions had to be competent, accountable and financially responsible. Competition and consumer protection were intended to reinforce one another.[5]
THE CENTRAL PHILOSOPHY The Act was not simply about deregulation. It was about regulated competition: using choice and competition to improve service, while using law to protect standards, independence and the public interest.
A retrospective account of the model project and its influence on the Victorian Act appears in the author’s later writing on the subject.[6]
3. Private certification: introducing choice into building approvals
The old position
Under the earlier system, the local council was the sole source of the building permit and the council building surveyor carried out the statutory approval and inspection functions. The applicant had no practical choice of permit authority.
The new idea
The 1993 reform introduced the private building surveyor. An owner could choose either the municipal building surveyor or a private building surveyor to perform the statutory building-surveying role. This created competition in the delivery of building permits and inspections without changing the technical standards that had to be applied.[7]
The purpose was to maximise consumer choice and encourage faster, more responsive permit services. If one approval pathway was slow, an applicant was no longer necessarily confined to it. The intended economic effect was shorter approval times, lower holding costs and quicker commencement of building work.
Private certification has proved controversial in practice. This paper does not attempt to adjudicate that later controversy. Its concern is the original design: private certification was intended to improve choice and service while statutory safeguards preserved independence and compliance. Those intentions did not always play out as envisaged.[8]
A public function delivered privately
Private certification did not turn the building permit into a private favour. The private building surveyor was still performing a statutory function. The surveyor had to apply the law independently, even though the surveyor had been selected and paid by a private client.
That distinction is essential to the architecture of the Act. The reform introduced competition in service delivery, not competition in the standard of compliance. Every building surveyor was required to administer the same public rules.
4. Continuity of appointment: protecting independence
Once private building surveyors could be chosen by clients, the legislation had to confront an obvious risk. A client might try to replace a surveyor who insisted upon compliance and appoint another surveyor thought to be more accommodating. If changing surveyors were easy, competition could weaken regulatory independence.
The Act therefore made it deliberately difficult to terminate the appointment of a private building surveyor. The appointment was not treated like an ordinary commercial consultancy that could be ended whenever the client wished. A formal approval process was required before the appointment could be brought to an end.
In the original scheme, termination was intended to occur only through the statutory process and with the approval of the Building Control Commission. The restriction was deliberately strong. It sought to reproduce, within a private certification model, the continuity that had existed when the municipal building surveyor remained responsible for the project.
This rule served a deeper purpose. It preserved continuity of responsibility throughout the permit process. The appointed surveyor retained the history of the project, the inspection record and knowledge of unresolved compliance issues. The rule also protected the surveyor from pressure to approve work merely to keep the appointment.
Philosophical principle: choice was introduced at the time of appointment, but not an unrestricted right to change the statutory decision-maker whenever that decision-maker became inconvenient.
5. Registration of key practitioners: controlled entry to the market
Opening the system to private participation made practitioner quality more important, not less important. The Act therefore introduced mandatory registration for key classes of building practitioners. Registration created a legal gateway into the industry.
Building surveyors, building inspectors, commercial and domestic builders, draftspersons, engineers, quantity surveyors and other prescribed practitioners could not simply hold themselves out as qualified. They had to satisfy formal requirements concerning qualifications, experience, competence and fitness to practise. Registration also placed them within a system of standards and discipline.[9]
The philosophical purpose of central registration was consistency. Instead of leaving entry standards to different local practices, the Building Practitioners Board would have jurisdiction over entry to, and exclusion from, the regulated market. One central body could determine who was entitled to carry out regulated work, impose common requirements and suspend or exclude a person who did not meet the required standard.
Architects should be distinguished from registered building practitioners under the Building Act. Architects were regulated through their own registration legislation and registration board, although their work was naturally connected with the building-control system.
Registration and insurance were intended to operate together. Registration established competence and probity at the point of entry. Mandatory insurance reduced the risk that a registered practitioner would leave a claimant with an uninsured liability. The Board’s control of registration gave the system a practical means of requiring both qualifications and prescribed insurance as conditions of lawful practice.
Philosophical principle: a competitive market in building services required a controlled gateway. Freedom to practise was conditional upon demonstrated competence, probity and continuing accountability.
6. Mandatory insurance: making legal responsibility financially meaningful
Registration alone could not protect a consumer if a practitioner became insolvent, ceased trading or disappeared. A person might have a valid legal claim but no practical means of recovering the loss. The Act therefore linked the right to practise with mandatory insurance requirements.
The purpose of professional indemnity insurance was to support the liabilities carried by building surveyors and other professional practitioners. Insurance converted legal responsibility into a more realistic source of compensation. It also supported confidence in a system that now allowed private practitioners to perform functions previously associated with continuing public institutions.[10]
Long-tail building liability created a special problem. A defect might not become apparent until years after the work was completed. The original insurance philosophy therefore included continuing or run-off protection so that the end of a practitioner’s business did not automatically mean the end of insurance protection for earlier work.[11]
THE COUNCIL AND PRIVATE-PRACTITIONER CONTRAST A council was a continuing institution. It did not retire, deregister or disappear, and it had an enduring capacity to stand behind liabilities over time. A private certifier might retire, cease practice, lose registration or leave the jurisdiction. The original design therefore asked what would stand behind the consumer’s claim if the individual practitioner was no longer there. The answer was mandatory insurance and long-term run-off protection.
This was closely connected to the liability period. If the law imposed liability for a defined period, the insurance arrangements had to be capable of responding throughout that period. The aim was to emulate, as far as practicable, the continuing financial capacity associated with local government and to align legal exposure with insurance protection for the full liability horizon.
Run-off cover was therefore not a peripheral insurance preference. It was part of the original consumer-protection architecture. Without continuing cover, the ten-year liability period could create a right in law but leave a hole in indemnity if the practitioner had retired, deregistered or disappeared before the claim was made (At the turn of the century the mandatory run-off cover mechanism was removed and this compromised the original upstream insurance protection provided by run-off [12]).
Philosophical principle: the right to perform regulated work carried a corresponding obligation to maintain financial capacity for the consequences of that work.
7. Proportionate liability: responsibility according to fault
The original Act adopted proportionate liability as part of its liability reform. Under the traditional joint and several approach, one solvent and insured defendant could be required to pay all the recoverable loss, even where several parties had contributed to the damage. That defendant could then try to recover contributions from the others.[13]
The reformers considered that this approach could place an unfair and unpredictable burden on the party with the deepest pocket or the most reliable insurance. In building disputes, that party was often a professional practitioner rather than the person most responsible for the defect.
Proportionate liability was intended to allocate loss according to each party’s share of responsibility. A building surveyor, designer, builder or other participant would answer for the part of the damage attributable to that participant’s conduct.
The philosophical foundation was fairness between responsible parties and greater predictability for insurers. Liability was to follow fault rather than the accident of which defendant remained solvent and insured.[14]
This is why proportionate liability cannot be separated from mandatory registration and insurance. Proportionate responsibility assumed that the key actors would be identifiable and insured. Without mandatory insurance, the insolvency or disappearance of one responsible party could leave an unrecoverable gap for the plaintiff. The insurance requirement was intended to reduce that risk.
8. The ten-year liability period: a clear end point
Before the reform, the ordinary six-year limitation period for building defects could be uncertain because the starting point depended upon when damage occurred and the cause of action accrued. With latent defects, the legally relevant damage might not become apparent until years after completion. The result was no single, readily identifiable date from which every participant could calculate the end of exposure.
The Act introduced a ten-year long-stop period for building actions. The issue of the occupancy permit, or the certificate of final inspection where appropriate, provided a clear and objective trigger date. From that date, owners, practitioners, councils and insurers could calculate the outer period of exposure
Ten years provided a substantial period for defects to emerge while also creating finality. The period drew upon the national model and international precedent for a defined decennial liability horizon, including the French tradition associated with the Napoleonic Code. The working assumption informing the design was that, by the tenth year, the incidence of newly emerging claims would be very small. Its purpose was not merely administrative. It made long-term risk measurable.
The ten-year period also complemented mandatory insurance. Insurers could understand the intended outer boundary of claims, practitioners could plan for run-off exposure and owners had a clear period within which building actions had to be brought.
Philosophical principle: legal rights require sufficient time to be exercised, but liability should not remain uncertain forever. A clear long-stop balances protection with finality.
9. Mandatory inspections: protecting the integrity of construction
A building permit approves proposed work. It does not prove that the work will be constructed correctly. The permit system therefore had to be supported by inspections during construction.
The Act and its regulatory framework required notification and inspection at prescribed stages. Those stages gave the relevant building surveyor an opportunity to examine important work before it was covered or before construction advanced too far. The regime made inspection part of the statutory process rather than a service that an owner could simply choose to omit.
Mandatory inspections connected the design on paper with the building on the ground. They also reinforced the surveyor’s continuing responsibility from permit issue through construction and completion.
The best-practice work underpinning the reform favoured mandatory inspection stages over a system in which inspections could be treated as optional. The reasoning was direct: consumer protection should not depend upon whether an owner or builder chose to request inspection of work that might soon be concealed. Prescribed stages created compulsory compliance checkpoints within the permit process.
Philosophical principle: competition in approval services could not replace physical verification. The system required compulsory checkpoints to protect safety and compliance.
The enforcement dimension of this compliance architecture — including the offence provisions that backed the inspection regime — is discussed further in the author’s later commentary on the Act.[15]
10. The Building Appeals Board: specialist and timely adjudication
The Act also established the Building Appeals Board as the specialist forum for resolving building permit-related disputes, appeals and technical questions. It succeeded the former Building Referees Board. The earlier adjudicative function was carried forward under a different name, but within a broader and more modern statutory framework.
The Board was designed as a multidisciplinary decision-making body. Its members were ministerially appointed people drawn from the relevant building professions and disciplines. The intention was that they would be experienced practitioners of good standing, respected by their peers and able to bring practical judgment to technical disputes.
The Board’s institutional purpose was speed as well as expertise. Building permit disputes can stop construction, increase holding costs and create uncertainty for owners, builders and regulators. A specialist Board could provide fast-track adjudication without requiring every dispute to proceed through the ordinary courts.
The Board therefore formed part of the same regulatory philosophy as the rest of the Building Act. A faster and more flexible approval system required an equally accessible mechanism for resolving disagreements about permits, technical requirements and statutory decisions.
Philosophical principle: building permit related disputes should be determined promptly by independent, multidisciplinary experts who understood both the legislation and the practical realities of construction.
11. How the reforms fitted together
The true importance of the Act lies in the relationship between its reforms. Each major reform answered a problem created by, or connected with, another reform.
Private certification introduced consumer choice and competition in permit delivery.
Continuity of appointment protected the independence of the chosen surveyor and prevented surveyor shopping.
Central registration controlled who could enter the regulated market and established common standards of competence and probity.
Mandatory insurance supported compensation and gave financial substance to professional responsibility.
Proportionate liability sought to allocate responsibility according to fault and make exposure more predictable.
The ten-year long-stop created a clear outer boundary for building actions and long-tail insurance risk.
Mandatory inspections preserved on-site verification within a system of competitive permit delivery.
The Building Appeals Board provided specialist, multidisciplinary and fast-track adjudication of permit-related disputes and technical questions.
Taken together, these reforms created a complete regulatory architecture. The Act used private initiative to deliver public functions, but it did not leave those functions to an unregulated market. It imposed rules about who could act, how they must act, how appointments could be changed, what insurance had to stand behind the actors, how long they remained responsible, when work had to be inspected and how disputes could be resolved.
THE ORIGINAL REGULATORY BARGAIN Choice was balanced by independence. Competition was balanced by registration. Liability was balanced by insurance. Consumer rights were balanced by a clear time limit. Permit approval was balanced by mandatory inspection. Regulatory decisions were supported by specialist and timely adjudication.
12. The deeper philosophy of the Act
At its deepest level, the Building Act 1993 reflected five connected beliefs.
First: regulation could be delivered through more than one institution
A public regulatory function did not always have to be delivered exclusively by a council. A properly qualified private practitioner could perform the function, provided the law preserved independence and accountability.
Second: markets require legal structure
Competition alone was not enough. The market had to be structured by entry requirements, professional duties, insurance and discipline. The Act was therefore neither pure public administration nor pure private contracting.
Third: responsibility should be identifiable and insurable
The system sought to identify who was responsible, allocate liability according to fault and ensure that key actors had financial protection behind their obligations. Responsibility was intended to be both legal and practical.
Fourth: certainty is itself a public value
Clear appointment rules, prescribed inspections and a fixed liability period reduced uncertainty. Owners, practitioners, regulators and insurers could understand the structure within which they operated.
Fifth: disputes should be resolved by specialists without unnecessary delay
The Building Appeals Board reflected the belief that permit and technical disputes required multidisciplinary expertise and prompt resolution. Specialist adjudication was part of making the whole regulatory system workable, accessible and responsive.
Conclusion
The Building Act 1993 was created during a period of national reform, but its philosophy cannot be reduced to privatisation or deregulation. Its central idea was regulated competition. Victoria opened the delivery of building permits and inspections to private building surveyors while preserving statutory standards and surrounding private participation with legal safeguards.
The Act’s original architecture rested upon a series of deliberate balances: choice and continuity, competition and competence, liability and insurance, consumer protection and finality, approval and inspection, and regulatory decision-making and specialist adjudication. Those balances explain why the reforms were introduced together.
For anyone seeking to understand why the Act was created, that is the essential point. The legislation was designed as a single system for modern building control. Its provisions were intended to make private delivery faster and more responsive without surrendering the public purposes of safety, accountability and confidence in the built environment. That statement describes the intended architecture; it does not suggest that every intention was realised in practice.[16]
Historical source base
This paper is grounded in the principal materials connected with the creation of the original reform:
Building Act 1993 (Vic), in its original enacted form.
Victoria, Parliamentary Debates, Legislative Assembly, 11 November 1993, Building Bill 1993, second reading speech.
Dix and Lovegrove, Model Legislative Provisions and Commentary (Federation Press, 1991).
In addition, the footnotes throughout this paper cite the author’s own contemporaneous and later published writing on the reform — drawn from the Lovegrove & Cotton eLibrary (the Building Act (Vic), Model Building Act (Australia) and Building Appeals Board sections in particular), together with his columns in The Age, The Australian, The Chartered Builder, Construction Australia Magazine, Building Owner and Manager Magazine and the Law Institute Journal — as a first-hand documentary trail corroborating the account given above.
About the author
Kim Lovegrove was Project Director of the National Model Building Act project and an instructing officer to Parliamentary Counsel in the development of the Building Act 1993. He later served as Chair of the Victorian Building Practitioners Board. His account of the Act’s philosophical foundations is informed by direct involvement in the conception and implementation of the original reform.
[1]Kim Lovegrove, “The New Building Act – A Revolution in Building Regulations and Liability Reform” (Lovegrove & Cotton eLibrary). lclawyers.com.au
[2]Kim Lovegrove, “Building Permit Regime in Need of Urgent Modification”, The Australian, 30 September 2004. lclawyers.com.au
[3]Kim Lovegrove, “Codes Revolution Is On Its Way”, The Age, 26 October 1996. lclawyers.com.au
[4]Kim Lovegrove and Barbara Deere, “The Model Building Act”, Law Institute Journal, August 1992. lclawyers.com.au
[5]Kim Lovegrove, “The National Model Building Act – the template for the Building Act 1993”, Lovegrove & Cotton eLibrary. lclawyers.com.au
[6]Kim Lovegrove, “Model Building Act – the Regulatory Template that Re-shaped Modern Day Building Control”, Lovegrove & Cotton eLibrary. lclawyers.com.au
[7]Kim Lovegrove, “Building Control – From Monopoly to Free Market to Hindsight”, Sourceable. sourceable.net
[8]Kim Lovegrove, “Risk, Private Certification, Insurance Premium Hikes and Mounting Challenges for the Profession”, Lovegrove & Cotton eLibrary. lclawyers.com.au
[9]Kim Lovegrove, “Importance of Builders Being Registered”, The Age, 5 October 1996. lclawyers.com.au
[10]Kim Lovegrove, “Run-Off Cover”, The Age, 9 November 1996. lclawyers.com.au
[11]Kim Lovegrove, “Run-off Cover Has Resulted in Peace of Mind for Building Practitioners”, Lovegrove & Cotton eLibrary. lclawyers.com.au
[12]Kim Lovegrove, “Time to Address Insurance Cover Anomaly”, The Australian, 13 May 2004. lclawyers.com.au
[13]Kim Lovegrove, “New Liability Rules Sever Traditional Links With British Laws”, The Age, 12 October 1996. lclawyers.com.au
[14]Kim Lovegrove, “Developing Sustainable Construction Liability Allocation Laws: Victoria vs. New Zealand”, Lovegrove & Cotton eLibrary. lclawyers.com.au
[15]Kim Lovegrove, “Prosecutable Offences Under the Victorian Building Act 1993”, Lovegrove & Cotton eLibrary. lclawyers.com.au
[16]Kim Lovegrove, “From Arbitration to Enforcement: Four Decades of Change in Victorian Construction Law”, Lovegrove & Cotton eLibrary. lclawyers.com.au, “From Arbitration to Enforcement: Four Decades of Change in Victorian Construction Law”, Lovegrove & Cotton eLibrary. lclawyers.com.au

On 3 February 2025, the Building Appeals Board (matter: 455647) found in favour of the Applicant in a section 160 (2) (b) Building Act 1993 application to modify the regulations which dictated the minimum rear setback of the subject property. The Applicant was represented by Lovegrove and Cotton Construction and Planning Lawyers, and the decision was made on the following.
Circumstances:
On 14 November 2019 Amendment C125 to the Monash Planning Scheme was legislated, which had the effect of changing the zoning of the property into a General Residential Zone, schedule 3 (GRZ3).
This meant that the rear setback was now imposed with a 5-meter minimum, a considerable difference to the previous 1-meter allowance.
The Building Surveyor issued a Building Permit based on the original plans on 23 November 2022, which essentially endorsed plans for the rear setback of 4.73m at one rear corner and 3.0m at the closet point to the rear boundary. Construction commenced, and continued until the dwelling was approximately 80% completed.
On 5 October 2023 a Building Notice and a Building Order to Stop Building Works were issued on the Property following the PBSs realisation of the non-compliant rear setbacks.
The owner, who was not at fault in relation to the non-compliance, sought permission from the City of Monash (Council) via a report and consent application, which was rejected due to the inability for the Council to issue report and consent on an as-built structure. Often, applicants may seek this permission via a ‘Report Only’ application, but in this instance this option was not provided by the Council.
Due to this, on 19 January 2024, the Owner made a section 160(2) (b) of the Building Act (Vic) 1993 application to modify regulation 79 of the Building Regulations 2018.
Section 160 (2) (b) Building Act 1993 reads:
An application may be made to the Building Appeals Board for the determination that a provision of the Building Regulations-
a) Does not apply; or
b) Applies with modifications or variations specified in the application –
To a building or land specified in the application.
Regulation 79 of the Building Regulations 2018 reads:
Side and rear setbacks
(1) If—
(a) an allotment is in a zone of a planning scheme specified in Schedule 6; and
(b) rear boundaries—
a schedule to that zone in the planning scheme specifies minimum setbacks from side and a building on the allotment must be set back from a side or rear boundary not less than the relevant setback specified in that schedule.
The Monash Planning Scheme for General Residential Zone 3 reads:
• A new wall not on or within 200mm of a rear boundary should be set back at least 5 metres.1
• Rear setback – 5 metres.
The issue to the owner then, was a restrictive planning scheme being in effect while construction of the dwelling was nearing completion. As stated in the Building Order, the Owner had the options of showing representations to the PBS to ‘Show Cause’ as to why the as built structure should remain, or appeal/make and application for review to the Building Appeals Board. Should this show cause response or the Building Appeals Board review be rejected, the building was facing demolition or modification to the extent that it was brought back into compliance.
Building Appels Board section 160 Building Act 1993 application

A section 160 Building Act 1993 review means you request the Board to find that the relevant regulation which is in breach does not apply to the specified building or land. The Building Appeals Board will hear the arguments of the applicant, the Council and any ‘interested partes’; generally the immediate neighbours of the subject dwelling.
A section 160 application is part of and subject to the conditions within division 5 of the Building Act (Vic) 1993, especially in the case of modification being sought:
Section 162 (3) – Special powers – modification of regulations.
(3) The Building Appeals Board must not determine that a provision of the building regulations applies to a building or land in a modified or varied form unless satisfied that to do so is reasonable and not detrimental to the public interest.
The application of what is ‘reasonable and not detrimental to the public interest’ can have regard to the Ministers Guidelines MG-12. The Ministers Guidelines MG-12 provide several considerations/hurdles, four which must be satisfied (if applicable) and at least one of the remaining five which must be satisfied:
Ministers Guidelines MG-12- Siting and design of single dwellings
Objective
To ensure that the height and setback of a building from a boundary respects the existing or preferred character and limits the impact on the amenity of existing dwellings.
Decision Guidelines
The reporting authority may give its consent to an application for a building permit for a principal single dwelling or a small second dwelling (as applicable) that does not comply with regulation 79 (Side and rear setbacks) of the Regulations if— all of the following criteria apply (a-d):
a. the setback will not result in a significant impact on the amenity of the secluded private open space and habitable room windows of existing dwellings on nearby allotments; and
b. the setback is consistent with a building envelope, if one has been approved under a planning scheme or planning permit and or specified in an agreement under section 173 of the Planning and Environment Act 1987; and
c. the setback will not result in a disruption of the streetscape; and
d. the setback is consistent with any relevant neighbourhood character objective, policy or statement set out in the relevant planning scheme, and at least one of the following criteria apply (e-i):
e. the setback will be more appropriate taking into account the prevailing setback of existing buildings on nearby allotments; or
f. the setback will be more appropriate taking into account the preferred character of the area, where it has been identified in the relevant planning scheme; or
g. the slope of the allotment and or existing retaining walls or fences reduce the effective height of the building; or
h. the building abuts a side or rear lane; or
i. the building is opposite an existing wall built to or within 150mm of the boundary.
As discussed in the decision of the s160 Building Act 1993 BAB application regarding the Mount Waverley applicant:
Amenity:
The BAB accepted the submission that the wording ‘significant’ impact on amenity, and that the submissions made by the RBS that the question to be answered is whether there is a ‘significant’ impact on amenity, not whether there is any impact at all. The impact that is to be assessed is not the impact of the Dwelling itself; it is the impact of the reduction in the setback from what is otherwise allowed as-of-right.
The BAB also took into consideration the:
– The Property is not parallel to the rear boundary.
– The boundary angels away from the second rear neighbour (who was an interested party to the proceedings).
– The Property is considerably lower (at 7.5 metres) than the maximum building height
allowance of 11 metres.
– A rear wall could have been built on the boundary, without requiring report and consent from the Council.
This contrasted with the Council and MBS submitting that there was significant visual bulk to the neighbours at the rear of the Property. The BAB found in favour of the applicant in this regard, following the opinion provided by the expert planning consultant and legal representatives.
Neighbourhood character:
The relevant Neighbourhood character objective reads as follows:
To support new development that contributes to the preferred garden city character through well landscaped and spacious gardens that include canopy trees.
To promote the preferred garden city character by minimising hard paving throughout the site by limiting the length and width of accessways and limiting paving within open space areas.
To support new development that minimises building mass and visual bulk in the streetscape through generous front and side setbacks, landscaping in the front setback and breaks and recesses in the built form.
The developer submitted that the only reference to setbacks was the front and side setbacks.
The Council and the MBS submitted that the reduction in the rear setback is not consistent with the preferred garden city neighbourhood character identified for the GRZ3.
The Board stated: “Having regard to the overall design of the Dwelling, and its compliance with remaining siting regulations (including, in particular, those relating to the front setback, site coverage and permeability), we find that the Dwelling is consistent with the adopted neighbourhood character objectives.” Essentially, the block was of a restrictive shape, which meant that although there was a breach in the regulations, sufficient space was still provided for the encroachment to satisfy the ‘garden city’ character prioritised by Amendment C125 of the Monash Housing Strategy.
Prevailing setback
The Applicant and the RBS relied on the fact that there are several buildings within the area which encroach into the five-metre rear setback and the Council and the MBS submitted that little weight should be given to these buildings as they were constructed before the Scheme was amended by Amendment C125.
The Board decided that MG-12 does not suggest the word ‘prevailing’ should be qualified by when the ‘prevailing’ buildings were constructed, and that comparisons can only be made to other buildings that encroach, with regard also to the size of the setbacks on the opposite side.
Conclusion
The Board stated that a determination does not turn on the Board making a positive finding that modification is in the public interest, only that it is not detrimental. The Board stated: “having formed the view that the modification sought is reasonable, we may now grant the relief sought unless we form the view that it would be detrimental to the public interest for us to modify or vary the provision of the building regulations that would permit that relief sought.”
The finding of the BAB in these circumstances meant that demolition was not required of the dwelling, and that construction work could continue.
While there was an extremely prejudicial alternative to the owner of demolishing a nearly completed property, section 160 applications can still be difficult. For this reason, this favourable Building Appeals Board finding resolved the situation for the owner and avoided a costly demolition order.
Disclaimer
This article is for general informational purposes only and does not constitute legal advice. For advice specific to Owners Corporations, building defects, or dispute resolution, please contact Lovegrove & Cotton at enquiries@lclawyers.com.au or call (03) 9600 4077.
Image Acknowledgements:
The digital renders used in this article were developed collaboratively by Lovegrove & Cotton and ChatGPT. The photo images that are not the digital renders are stock images sourced from Shutterstock.
Footnotes

The Building Legislation Amendment (Buyer Protections) Bill 2025 (Vic) (“the Bill”) introduces sweeping changes to Victoria’s building regulatory framework, aimed at strengthening enforcement mechanisms, enhancing consumer protections, and increasing accountability for certain actors such as developers and builders.
The reforms give the Victorian Building Authority (“VBA”) broader powers, including the power to apply to extend liability limitation periods in certain circumstances, and introduce financial securities such as developer bonds.
While these changes clearly strength consumer safeguards they could introduce unintended consequences, including liability disputes between builders and developers, blurred lines of conflicting jurisdictions between building surveyors and the VBA in terms of enforcement mandates, the potential to increase construction costs, and extended liability exposure beyond the long-standing 10-year cap.
The balance between consumer protection and industry sustainability will ultimately depend on how these reforms are implemented and enforced. This is an attempt at providing a dispassionate analysis of the reforms and in some instances how they may pay out.
Expanded powers for the VBA

Broad authority to issue rectification orders
- Under Section 75B of the Bill, the VBA can now issue rectification orders (ROs) to:
- A person who carried out the work. This would mean the builder and conceivably would mean the owner builder. It could also mean to persons that have carried out the building work illegally i.e. without a building permit.
- Developers of residential apartment buildings.
There is no doubt that this significantly increases accountability and broadens the enforcement net beyond just builders.
Under section 75B(2) (a) RO can only be issued if the building work is incomplete, noncompliant or defective in circumstances where no more than 10 years have lapsed since the issue of an occupancy permit, the certificate of final inspection or in circumstances where a building permit is not required, then the ‘date of practical completion’. The RO can be issued regardless of whether the building work was carried out under a contract or met the requirements of the Domestic Building Contracts Act 1995(Vic) (“DBCA”).
Pursuant to section 75B(8) of the Bill, the VBA can issue ROs for work that has been commenced pursuant to a building permit, whether or not a certificate of final inspection or occupancy permit has been issued. This captures the ‘work in progress’ paradigm.
Applications may be made to extend the period of time in play for issue of ROs pursuant to section 75C of the Bill, the application has to be made to the Victorian Civil and Administrative Tribunal (“VCAT”) which has the discretion to extend.
Rectification order powers and directives
The respondent can be compelled to complete and rectify non-compliant and defective building work, and the respondent(s) will have to comply with the stipulated period of time. It is envisioned that there will be tension on the part of the respondents to determine who will bite the bullet as it were and make good the compliance obligation.
The wingspan of the type of building work that can be captured by an RO is not a ‘catch all’ but it is pretty extensive.

Section 75E (1)(a) (iii) stipulates that the mandate of an RO may also require the respondent to rectify any damage caused in carrying out the building work or by the non-compliant or defective building work including:
- drainage impairment; and
- undermining of a fence, retaining wall or boundary structure; and
- the compromising of the structural integrity of a building, swimming pool or wall; and
- the cracking, lifting or cratering or a driveway or pathway; and
- water penetration; and
- infestation by termites.
RO work has to be carried out by a registered practitioner, but a building permit is not required to carry out the work.
Section 75E(5) provides that a registered builder has to carry out the building work that is the subject of the RO which is predictably prudent.
There is however a paradox in that section 75E(6) provides that a building permit ‘is not required to carry out building work required by the rectification order’. This is a very interesting development as the rectification work could be significant.
It has under the traditional regime been illegal for anyone to carry out building work in Victoria without a building permit pursuant to section 16 of the Building Act 1993 (Vic) (“Building Act”). On face value, there would appear to be a conflict here as the carrying out of building work without a building permit under the said section is a very serious statutory offence. The reason for this is that the building permit and the building permit delivery process are designed to protect the consumer by ensuring that work is carried out in accordance with the approved plans and the construction code, that the work comes under the umbrella of the Building Act and its statutory protections.
In circumstances where this firm has been retained to regularise matters when municipal building surveyors (MBS) have issued building orders with respect to non-complaint building work, our practice has always been to agree that a new building surveyor is engaged to approve rectification building works plans, to issue a new building permit and ultimately issue a certificate of final inspection when the building work is completed. The MBS normally require an engineer to certify that the work is fit for purpose also. This approach engenders an outcome that brings the work of the subject of the building permit into the protective umbrella of the legislation.
Conceded MBSs have the power to waiver the building permit requirement when they issued emergency orders, but this is because of an emergency situation i.e. imminent threat to life and limb is in play.
The consequences of this ‘relaxation’ could be multifarious namely absent of building permit:
- There will be no occupancy permit so the 10-year liability cap will not crystalise.
- If it is residential building work it might compromise the home warranty insurance cover that would have been taken out by the original residential builder.
- There may be no such cover for the new work, hence if the builder goes belly up there will be no insurance fall back for the rectification work.
- The registered building practitioner engaged to do the rectification work may be somewhat nervous as the builder will be venturing into a no man’s land of sorts.
From a consumer protection point of view, the carrying out of building work particularly when the RO is issued for non-complying building work is very problematic. Hopefully this consequential impact of this provision will be given more consideration.
Section 75I Authority may require participation in the dispute resolution process

This provision contemplates a dispute resolution process in circumstances where the authority does not think that the building owner has made a reasonable attempt to resolve the dispute, and the Authority can require the owner to participate in the dispute resolution process. The process will no doubt be enunciated by way of regulations in the fullness of time. Question whether there will be a separate and discrete dispute resolution tribunal, will there be mediation and what if a settlement cannot be engineered?
Notice requirements
Pursuant to section 75N, the authority has to give written notice as soon as practical after the RO is issued to the:
- Developer; and
- RBS; and
- The MBS if the MBS is not the Relevant Building Surveyor (RBS); and
- The owner of the land ; and
- A prescribed person (if any).
The beginning of an assumption of powers enforcement powers that were traditionally the domain of building surveyors in Victoria and the strengthening of the compliance enforcement regime
A major shift in enforcement power
Traditionally, rectification enforcement was limited to:
- The MBS’ emergency powers under Section 106 of the Building Act.
- The broader enforcement framework under Section 212 of the Building Act, which placed elevated responsibility on municipalities for their rate paying hinterland.
- RBS issuing building notices and orders that often-achieved indifferent results as they lacked real teeth.
- In the case of private certifiers, if there was non-compliance with a building order, the matter had to be referred to the VBA, and the private certifier was not allowed to have anything further to do with the matter.
- As the majority of the RBSs are private, the system had real limitations from an enforcement perspective. There was also the apprehension that some certifiers were loathe to come down hard on the builder thus ‘diminishing’ the effectiveness of an important statutory power.
- Under any criteria, this is a significant ‘upping of the ante’, and the reforms have real teeth.
- Having said that, the new powers of the VBA to issue ROs in matters of noncompliance seem to be concurrent and possibly ‘duplicatory’ powers. It will be interesting to see how this plays out to see whether building surveyors who already in some instances are reticent about issuing building orders will become more so.
- As the RBSs have to be copied into the ROs, it will follow the RBS and the VBA will cooperate and there may be more spirit d’accord.
The registrar of titles has to be given notice when an RO is issued for a serious defect with respect to residential apartment buildings
Pursuant to section 75Q of the Bill, the VBA has to give the registrar and the RBS a copy of the RO when it is issued pursuant to section 75Q(1) of the Bill. Further once the rectification work has been complied with the VBA must notify the registrar of that outcome. This is a lengthy section and has to be read with great care as it goes into considerable detail.
Review powers
Section 75S articulates the review powers available to those affected by a decision of the VBA with respect to an RO and the associated consequences and implications. There does not appear to be a stay power i.e. a power to stay the RO. Absent such a power, it would appear that the RO respondent will have to comply with the order regardless of the merits of the matter.
Addressing post-occupancy weaknesses
- Previously, after an occupancy permit was issued, the RBS had ambiguous enforcement powers and rarely issued orders unless an immediate safety risk was present, typically only at the behest of a MBS.
- Under the new framework, ROs can now be issued after an occupancy permit has been granted, ensuring greater enforcement oversight. This is sound.
Joint and several liability for compliance
New liability framework
- Under Section 75B(4) of the Bill in circumstances where there is more than one respondent, they are jointly and severally liable for compliance.
- This provision would capture those that were responsible for the building work and the residential apartment developers.
- This is significant as for the first time since promulgation of the Building Act joint and severable liability has been re-introduced under the guise of rectification orders.
- It is at odds with the more universal proportionate liability framework under the Wrongs Act 1958 (Vic) (“Wrongs Act”).Section 24AI of the Wrongs Act provides that:
- ‘In any proceeding involving an apportionable claim—
(a) the liability of a defendant who is a concurrent wrongdoer in relation to that claim is limited to an amount reflecting that proportion of the loss or damage claimed that the court considers just having regard to the extent of the defendant’s responsibility for the loss or damage; and
(b) judgment must not be given against the defendant for more than that amount in relation to that claim’
- Question whether a conflict of laws issue will be in play. It could probably be successfully argued that an RO is not an apportionable claim but philosophically it heralds a significant departure from the underlying philosophy that embraces responsibility driven liability apportionment.
Potential consequences of the joint and several liability encroachment
- Under standard proportionate liability, each party is responsible only for their share of a defect.
- However, under Part 5A of the Bill, the respondents to an RO are fully responsible for compliance, regardless of fault.
- In all likelihood, this will lead to subsequent litigation between the developer and the builder. Once rectification costs crystallise, both parties will seek to shift liability onto the other and will likely belatedly join the RBS if there is an argument that the work did not comply with the National Construction Code (NCC).
- The developer will likely argue that it was incumbent upon the builder to construct the building in accordance with the NCC and the section 8 statutory warranties under the DBCA.
- If the work is defective, it is highly likely that the builder will have breached the statutory warranties and the developer will argue that prima facie the builder is exclusively liable for rectification. One consequence of this is that it tends to undermine the rationale that would have underpinned the statutory warranties namely that the builder is to warrant that their workmanship is fit for purpose. It is not easy to fathom circumstances where the developer would have created liabilities that are captured in the section 8 warranties; which also pursuant to section 9 of the DBCA, run with the land.
- It is submitted that the primary source of disputes between developers and owners arises when the drawings included in the contract of sale package do not align with the final built product.
This discrepancy often occurs because different sets of approved drawings were used—one forming the basis of the sale contract and another set of drawings approved by the RBS guiding the builder’s work under the building contract. If such a misrepresentation can be established, it could fall within the scope of joint and several liability as contemplated by the relevant legal framework.
- This provision does not however align ‘immaculately’ with statutory warranties, as it effectively makes the developer a fallback guarantor for the builder’s legal responsibilities. Normally, these liabilities are covered by warranty insurance, except for buildings taller than three stories, where such coverage does not apply.
Since the amendments do not require mandatory insurance for residential builders on buildings over a certain height, to reiterate developers effectively become the fallback for covering liabilities, a quasi-insurer of sorts. While this improves consumer protection, developers may wonder why they are held responsible for issues caused by registered builders, especially when another law provides a remedy for such situations.
VCAT’s power to extend liability periods for ROs

Challenging the 10-year liability cap
The VBA can seek to extend liability beyond the 10-year cap by applying to VCAT under Section 75C of the Bill. As this is a very significant departure in philosophy i.e. the philosophy of a clear and unambiguous limitation stop gap, the section is quoted verbatim below:
- “The Authority may apply to VCAT for an extension of the time within which the Authority may issue a rectification order in relation to particular building work.”
- “An application under subsection (1) must set out the reasons the Authority is applying for an extension of time.”
- “VCAT may make an order extending the time within which the Authority may issue a rectification order for the building work, if VCAT is satisfied that the reasons justify the extension.”
For fear of labouring the point, this is a major departure from legislated status quo, which previously cut off the ability to initiate legal proceedings after a decade since the issue of an occupancy permit had lapsed (save for the amendment that extended the ability to sue for cladding defects for an additional period of 5 years).
The apposite part of section 134 of the Building Act that captures the additional tightness of the 10-year cap is below:
- “Despite any thing to the contrary in the Limitation of Actions Act 1958or in any other Act or law, a building action cannot be brought more than 10 years after the date of issue of the occupancy permit in respect of the building work (whether or not the occupancy permit is subsequently cancelled or varied) or, if an occupancy permit is not issued, the date of issue under Part 4 of the certificate offinal inspection of the building work.”
Consumer protection: first-resort domestic building insurance
Easier claims for homeowners
Building owners can now claim insurance for defective or incomplete work without first pursuing the builder under section 137K of the Bill. This would remove the long and circuitous process of chasing responsible parties before an insurance payout. The reform would be a major win for consumer protection, it may increase however insurance premiums, time will tell.
Developer bond scheme: holding developers accountable
A new security requirement
Under Part 6, Division 1 of the Bill, developers must lodge a financial bond to cover potential building defects in residential apartment buildings over three storeys (section 93).
The key provisions include:
- Applicability to multi-storey residential buildings (four storeys and above) and does not apply to single dwellings, townhouses, or low-rise residential buildings (three storeys or less).
- The bond is set at 2% of the total construction cost for eligible buildings.
- The VBA will hold the bond for two years and may use it to fund rectification works if defects are identified.
Contractual and market implications
The introduction of developer bonds may have several potential consequences:
- Developers facing rectification cost orders may seek to recover these funds from builders through contractual indemnities or litigation.
- Developers may extend the tenure of contractual defects liability periods under the building contract to two years and withhold 2% of the contract sum as retention, secured by instruments such as bank guarantees. Many developers already insist that builders provide a 12-month security, this is likely to be stretched out to 2 years. While this approach would not negatively impact consumers, it could affect cash flow dynamics for contractors.
- There is also a risk that developers may increase contract prices to absorb the cost of the bond, potentially passing the financial burden onto buyers. This could have an inflationary effect on apartment construction costs, particularly for high-rise and high-risk projects.
Additional reform priorities: strengthening prevention and risk management
Whilst the Bill strengthens post-construction enforcement, it does not adequately address preventative measures that would reduce the incidence of defective work before it takes shape in the as built form as the reforms are more focussed on how to react to non-complaint building work rather than how to prevent it.
The following proactive reforms could significantly improve regulatory oversight and enhance consumer protection without increasing compliance burdens unnecessarily.
Risk-Based Building Inspections

Image Credit: IBQC
A graduated inspection regime could be introduced, aligning the frequency and depth of inspections with the risk profile of the building.
- High-risk buildings (e.g., high-rise residential, hospitals, and aged care facilities) should undergo more frequent and thorough inspections than low-risk single dwellings.
- The IBQC consequence-based guidelines are instructive in this regard, aligning regulatory scrutiny with potential risk exposure.
- Currently, finite compliance resources are spread thinly across all buildings, rather than being directed where the risk of defects is highest.
Nine-year notification system: proactive claim management
Rather than indefinitely extending liability periods as is contemplated by section 75C of the Bill, a legislated and structured notification system could encourage earlier defect detection and remediation:
- At year nine, local councils—as the holders of occupancy permit records—would generate automated notifications to property owners, advising them that only one year remains to lodge claims for defective work.
- Conveyancing laws could mandate disclosure of the 10-year expiry date in sales contracts:
- Red-light warning: Final year approaching
- Orange-light warning: Nine-year notice mechanism activated
- This approach is already under consideration in some international law reform efforts, where this firm has been engaged to advise on liability and insurance regime overhauls in offshore jurisdictions.
This structured alert system would ensure that homeowners take action before their rights expire, rather than discovering defects too late when the statutory warranty period has lapsed. Furthermore, the integrity and consumer and practitioner security that coincides with a clear 10-year limitation period would not be compromised. If the section 75C reforms go ahead, the 10-year plus infinity scenario will be in play and this will generate unintended consequences.
Strengthening rectification orders (ROs) through early intervention
If the nine-year notification system identifies a potential defect, but the responsible party refuses to rectify it, the VBA should be empowered to issue a Rectification Order (RO) immediately. This proactive defect detection model ensures that remediation efforts begin before the statutory liability period expires, rather than allowing latent defects to emerge only after consumers lose their rights to claim.
Final joint inspection protocol: pre-occupancy peer review

A peer review inspection process could be mandated before an occupancy permit is issued, similar to the Chinese system.
- Developers, builders, engineers, and architects would participate in a final joint inspection convened by the Building Surveyor, and it would be a peer review by all of the responsible actors.
- This best practice approach was applied to the Shanghai Tower, where an 18-month delay occurred between the first peer review inspection and the final occupancy permit, ensuring rigorous pre-occupancy defect detection.
Such a process could prevent a significant portion of post-handover disputes, ensuring that any defects or matters for non-completion are identified by a peer reviewing of the key actors and rectified before the building surveyor issues the occupancy permit.
Annual user-pays auditing for building surveyors
An independent auditing regime for Building Surveyors (BSs) could be introduced on a user-pays basis to detect potentially systemic compliance issues early.
- Regular independent audits of surveyors would act as an early-warning detection system, preventing low-quality approvals from compounding into large-scale defects.
- This mirrors best-practice risk mitigation systems in other industries, such as trust account audits in the legal profession, which ensure accountability and financial integrity.
- A user-pays auditing model would ensure systemic problems are identified before non-compliant work becomes embedded in the built environment.
Conclusion: A significant regulatory shift with complex implications
The Building Legislation Amendment (Buyer Protections) Bill 2025 represents a major new chapter in the evolution in Victoria’s building regulatory framework. The expansion of rectification orders (ROs) to include developers, and the introduction of developer bonds strengthen the consumer protection framework. The bill also enhances the enforcement capabilities of the VBA.
However, certain aspects of the reforms introduce complexities that will require careful implementation. The removal of the requirement for a building permit when carrying out rectification work is a notable departure from conventional regulatory processes. Building permits have traditionally served as a critical checkpoint to ensure that rectification work aligns with the NCC and is subject to independent oversight. Without this requirement, there may be challenges in ensuring that rectification work meets the necessary compliance standards and consumer protections.
The shift toward joint and several liability under rectification orders also marks a significant change. This contrasts with the proportionate liability framework that has been in place for many years, potentially leading to complex liability disputes between builders, developers, and other stakeholders. These disputes may require further legal clarity to ensure that responsibilities are fairly apportioned and do not create unintended pressures on any single party.
Additionally, the VBA’s ability to seek extensions beyond the traditional 10-year liability cap introduces a longer-term mechanism for addressing latent defects. While this on face value would appear to enhance consumer protection, it is likely to trigger something tantamount to liabilities in perpetuity and such liabilities that could have been covered by professional indemnity run-off cover will no longer be possible to underwrite.
The reforms are significant and are probably the most significant reforms since the promulgation of the Building Act in 1994.They will require very significant resource allocation by the VBA such as the ‘bandwidth’ of the RO capture. Furthermore, some of the powers are duplicatatory, namely the power to issue ROs in circumstances that were typically the domain of the RBS.
The developer bonds will have support from consumers, but a 2% developer bond is no substitute for an effective home warranty scheme for a north of three-storey paradigm.
This article was prepared by Lovegrove and Cotton team, and was settled by Tsigereda (Ziggy) Lovegrove, Solicitor and Practice Manager of Lovegrove and Cotton, and the Secretary of IBQC Dispute Resolution Committee. Ziggy is also involved in the Law Reform team that is providing liability and insurance advice to an off-shore country, with respect to potential amendments to thesaid country’s Building Act.
Some of us in Lovegrove & Cotton have significant local and internation law reform experience. We currently have off-shore government deployments. Contact us if you require any law reform advice in the development of building regulation on (03) 9600 4077 or via email at enquiries@lclawyers.com.au and enquiries@lclawyersnz.com
Disclaimer
The information provided in this article is for general informational purposes only. It does not constitute legal advice. For specific legal advice, please contact us on the above contact details.
Image Acknowledgements:
The digital renders used in this article were developed collaboratively by Lovegrove & Cotton and ChatGPT. The photo images that are not the digital renders are stock images sourced from Shutterstock.

The World Organization of Building Officials (WOBO) has acknowledged the work of Lovegrove & Cotton for their recent contributions to the International Building Quality Centre (IBQC). WOBO noted the firm’s involvement (in a WOBO update dated 28 March 2024) regarding IBQC guidelines, stating, “WOBO appreciates the work carried out by Lovegrove and Cotton and their recent updates in respect of IBQC.”
Members of the Lovegrove & Cotton team have been instrumental in assisting with the development of the IBQC Risk-Based Building Classification and Mandatory Inspection Guidelines. These guidelines were developed over 18 months, involving collaboration with leading professionals from the United States, United Kingdom, Australia, New Zealand, and Germany. The guidelines focus on implementing a risk-based approach to building classification and mandatory inspection processes.
On 28 March 2024, three key articles authored by Lovegrove & Cotton were republished by WOBO:
- IBQC Risk-Based Building Classification and Mandatory Inspection Guidelines – Details the collaborative effort in developing these guidelines.

- The New IBQC Risk-Weighted Building Classification and Mandatory Inspection Guidelines – So Compellingly Logical – Discusses the rationale behind a risk-based approach to building codes.

- 15 Core Elements of Best-Practice Building Regulation Highlights the essential components that contribute to effective building regulations.

Lovegrove & Cotton acknowledges WOBO’s recognition and is very grateful. The firm also recognizes the important role that this highly regarded global body plays in advancing good practice approaches to building regulation and building control.
Lovegrove & Cotton will continue to support the development of robust building regulatory frameworks, in line with a tradition of helping to establish good practices in building control dating back more than 30 years.