Strategic Considerations for Winning Building Disputes and Litigation
There are invariably winners and losers when building disputes run to conclusion.
Loss is seldom attributable to a fault on the part of legal decision makers, as judgements are handed down on the basis of facts, arguments, precedents, common sense and logic. Loss and victory is thereafter assigned accordingly. The law is not such a mysterious discipline. In rare instances decision makers get it wrong, but the wrong is typically righted on appeal.
Why, then, do litigants proceed to trial in circumstances where both parties are confident of victory yet both opponents are mindful of the fact for there to be a victor there will have to be a loser?
Building disputes are invariably characterised by:
- defective building work
- time overruns
- over payments or cost overruns
- monies being owed to builders and contractors
As building disputes are so very technical in nature, expert witnesses play a vital role. A lawyer is not qualified to inspect and diagnose the cause of construction failure. It would be negligent for a construction lawyer to presume in such matters, and he or she would not be indemnified by an insurer for venturing into the expert witness terrain.
So there is a case to argue that the role of the expert witness in a construction dispute is even more fundamental than that of the lawyer. The lawyer after all, in getting a case trial ready, provides the theatre for the experts to persuade a decision maker that their technical diagnoses and costings are more plausible than those of their opponents. Sure there might be legal arguments concerning contractual interpretation and repudiation, but it is the technical diagnostics that shape the size of the award for quantum.
So one’s choice of technical expert is very, very important. This being the case, when one engages a technical expert, it is crucial to look for:
- someone in possession of the relevant skill sets, be they costing, engineering, construction or design
- an expert with whom one is familiar with; a person that is held in high esteem
- Integrity, candour and a spine – no one likes surprises, so it’s not about the expert telling you what you want to hear. One needs the truth, and often that does not align with that the client’s position. Hence you need an expert who can stand up for themselves, will not be led, and backs a position.
- eloquence, as the expert has to be persuasive in the giving of expert opinion
- unflappability, as expert witnesses will be subjected to the blowtorch of cross examination where the advocate will seek to discredit and sometimes humiliate the expert to nullify the effectiveness of the testimony
- experience giving testimony in court; the court is no place to “road test” a fledgling for fear of the client becoming the casualty
Alas, unless one has a “road-tested relationship with an expert” one of the few ways to locate experts of higher calibre is by way of word of mouth. Otherwise it can be a lottery, because there is no expert accreditation or registration regime. Expert witnesses are not found in the categories of building practitioner registrants, so they do not come under the jurisdiction of any oversight body like the VBA. Unlike lawyers and doctors, there is no ability to strike an expert off the roll, because there is no roll.
Furthermore there is no recognised qualification in expert witness testimony, nor is there any requirement by law that they be insured. If a lawyer is negligent in a building case, regardless of whether it is due to an over-reliance upon expert evidence or other factors, the aggrieved knows the solicitor by law is required to be insured. No such luck for the aggrieved with the expert.
Troublingly, in 30 years of practice, during which time we have been involved in thousands of building disputes, we have never witnessed a plaintiff expert agreeing with a defendant expert on diagnosis and costing. We are not going to speculate on the reasons for the divergence, but the contrary nature of expert evidence has become part of the DNA of building disputes. This is a very serious problem in the dispute resolution dynamic. The inability of the system to facilitate convergence of expert opinion is, in our view, the greatest factor that influences the winning or losing of cases. If the experts cannot or will not agree on the construction solution or the cost of the solution, how the hell can a matter be resolved?
Choosing the right lawyer
Being unfamiliar with the relevant statutes, case law and contracts, and lacking the know-how regarding where to find the best technical expertise, non-specialist lawyers can flounder. This is particularly true when they come up against a seasoned and battle-hardened construction lawyer.
It is critical that the client provides accurate and comprehensive instructions. It is equally critical that the lawyer, flanked by the expert witness, provides a very candid risk assessment in writing of the strengths and weaknesses of the case. A failure to risk proof the case will inevitably culminate in that which proves to be the antithesis of all things one hopes for.
Insurers, sometimes known as professional litigants, always insist that their lawyers as soon as practicable provide a written legal opinion that clinically and dispassionately analyses the liability risks and the quantum. Typically an insurance letter of advice template will have the following headings:
- Facts and Chronology
- Liability and Indemnity
- Quantum
- Best case Scenario
- Worst Case Scenario
- Likely Scenario
- Reserve
The reserve will be calculated on the basis of the likely scenario.
The letter of advice will be updated regularly and any changes to the risk profile of the file will be factored into the advice. This type of rigour is conducive to no-surprise litigation and assists with formulating of settlement offers. Plaintiffs should also embrace the same type of rigour, although it is not common and absent the rigour, a case can “run a cropper”.
Do not give in to emotion and false hopes
Litigation is by definition emotional and stressful, but emotion cannot be allowed to impact upon decision making, nor can ill temper or anger, as these can cloud one’s vision.
For the plaintiff, litigation is by and large about getting paid an amount of money that will place them in the position they should have been if matters had not gone off the rails. Typically this will mean receiving a sum of monies that will fix defects and resolve associated expenses whilst spending as little money as possible. It is pure mathematics.
For the defendant, it is about paying out as little money as possible, period. There is no largess in construction litigation, no generosity and there are no windfalls. So if a litigant thinks they will get a windfall and in bending the lawyer’s ear gets him or her to tell them what they want to hear rather than what they will on balance get, sadness and disillusionment will surely follow. It follows that the lawyer retained must – like the expert – reality test.
Over the years, we have seen a lot of opponents who harbour unrealistic aspirations either in terms of the payout or the payday. The truth always plays out in a court of law and the result invariably is close to the real cost to fix and or complete, and the real cost of delays. There is no padding, no fat, and no largess. It is thus incumbent upon the client’s lawyers and advisers to reality test to remove any false hope.
The cost of litigation
Despite repeated attempts by policy makers to reduce the cost of litigation, success has remained elusive. Construction litigation is very expensive and in their determination to spend less, litigants often choose advocates who charge less but at the end of the day achieve less for the clients. The top practitioners generally have a lot of work on and they don’t compete on the basis of fees. Rather, they compete on the basis of expertise.
Furthermore, the litigation team will typically involve a barrister, a solicitor and an expert witness, which costs a lot of money. The high costs sometimes dictate that litigants simply cannot continue with their cases and this can culminate in loss, particularly if they are forced to become lay advocates.
A refusal to settle in a timely manner
If the parties can’t negotiate and settle their cases at mediation, they lose the ability to maintain control over their destiny. Once a matter goes to trial and a third party – the decision maker – assumes that control and determines one’s destiny, to the victor the spoils. When a case is lost, it is most often because the parties refuse to settle. The refusal would have been based upon underestimating the strength of the opponent’s case, sometime stubbornness, and there is always insufficient appreciation of the dangers inherent in not settling.
Sadly, there is no silver bullet when it comes to resolving building disputes. If such panacea existed, no one would ever lose a case and trial advocates would be out of work.
But maybe, just maybe, these musings provide some assistance to those who are about to embark to enter into adversarial theatres.
Disclaimer
This article is not legal advice and discusses it’s topic in only general terms. Should you be in need of legal advice, please contact construction law firm. Lovegrove & Cotton Lawyers and our experienced lawyers will assist you based on the facts and circumstances of your case.
Lovegrove & Cotton Lawyers to the building industry
For thirty years, Lovegrove & Cotton have represented property owners, builders, building surveyors, and building practitioners in Melbourne, Canberra, Sydney and Queensland. Lovegrove & Cotton can help property owners and building practitioners resolve any type of building dispute. If you wish to engage the firm, feel free to contact us via our website, by emailing enquiries@lclawyers.com.au, or via phone at (03) 9600 4077.