Building law when climate risks change: How the IBQC Model Building Act and the Good Practice Guidelines for Existing Buildings can inform reform

27 Nov 2026

By Adjunct Professor Kim Lovegrove

An apartment building can pass its final inspection and become dangerously hot twenty years later. A school that opened on dry ground can lose its access road in a flood. The work may have been properly approved and inspected in both cases. The question is what the law can do when the evidence on which the approval rested no longer describes the conditions in which the building has to operate.

Building standards and renovation were on the COP31 agenda for climate-resilient cities. The question for building law is what happens when the evidence changes after people have moved in (COP31 Action Agenda).

Two instruments from the International Building Quality Centre offer ideas for consideration. The IBQC Model Building Act shows how a jurisdiction could respond in law when a risk emerges in a building already in use. The IBQC Good Practice Guidelines for Existing Buildings help determine whether an upgrade is justified and how its effectiveness can be checked over time.

What the IBQC Model Building Act makes possible

Section 10.1(6) allows regulations to apply to existing buildings even when no work is under way or proposed. A jurisdiction could use that power to specify when a class of occupied buildings is to be assessed and what evidence would justify further action. That is a different regulatory task from assessing a permit application. The buildings at greatest risk may have no works planned and no immediate reason to come to an official’s attention (IBQC Model Building Act § 10.1(6)).

The same power will operate differently from one jurisdiction to another. Where inspectors are scarce, assessments could start with buildings where the consequences of failure are most serious. Where much of the stock sits outside the permit system, local authorities may have to work with builders and communities to identify buildings at risk and find measures that can be installed and maintained locally.

For new building work, section 4.2 provides for the regulations to apply the jurisdiction’s building code as it changes. Sections 10.1 and 10.2 allow performance standards and requirements that vary by place and circumstance. Schedule 2 includes cooling, ventilation and insulation, as well as flood prevention and the designation of areas exposed to flooding and bushfire. Those powers give a jurisdiction room to translate changing climate evidence into technical requirements suited to local conditions (IBQC Model Building Act § 4.2; §§ 10.1-10.2; Schedule 2).

For new construction, a standard can address how apartments perform during prolonged heat or how a hospital’s essential equipment is protected from flooding. The climate evidence, the technical standard and the permit decision may sit with different institutions. The legal framework connects those decisions and determines when the revised requirements take effect.

Part 8 provides a separate route for an individual building that poses a danger. An official can give the owner notice and an opportunity to respond before ordering inspection, testing or action to reduce the risk. The Model Act also provides for emergency orders where immediate action is necessary. Its Building Appeals Tribunal can review notices and orders, including emergency orders. Where an order restricts occupation, the grounds for the decision and the consequences for occupants both matter (IBQC Model Building Act § 7.2; §§ 8.1-8.4).

Mandatory inspection during construction

The experience of Japan after the 1995 Kobe earthquake illustrates why the inspection regime matters. The damage revealed construction deficiencies that effective site inspections could have detected. Japan strengthened interim inspection under its 1998 reforms and authorised designated private bodies to supplement public inspection capacity. The World Bank reports that the final inspection rate rose from less than 40 per cent before the reforms to more than 90 per cent by 2016 (World Bank study, §§ 4.3.3-4.4).

The relevance of Japan’s experience is the timing and enforcement of inspection. Work needs to be checked while defects can still be seen and corrected. Section 4.23 of the Model Act ties prescribed inspections to the building’s risk classification. Section 4.24 adds a distinct requirement. Unless exempted by regulation, medium- and high-risk buildings undergo an on-site joint final inspection before an occupancy permit can issue. The building official convenes the owner, builder, architect and engineer. If a fault is found, the relevant practitioner must rectify it and a further joint inspection must be convened (IBQC Model Building Act §§ 4.23-4.24).

The timing matters just as much when an existing building is upgraded. Consider a flood door in an underground car park. At a final visit an official can see the door close. By then the fixings and the junction with the surrounding structure may be concealed. An inspection before those details are covered answers a question the final visit cannot. A record of what was checked also helps the next person who has to assess the building.

Assessing and upgrading an existing building

The Guidelines counsel restraint in the retrospective application of new-building standards. Compulsion calls for a clearly justified case involving critical life safety. In an apartment block, that might start with evidence of the temperatures reached in bedrooms during prolonged heat. At a flood-exposed school, it might start with the route pupils and staff would actually use to leave. The findings determine whether a targeted measure can reduce the risk and what work can reasonably be justified (Guidelines § 6; § 7.9).

The Guidelines also call for the records to be tested against the building itself. Original drawings may show how a ventilation system was intended to work. A visit can establish whether it still works that way, whether later alterations changed the airflow and whether the building is used as originally envisaged. A retrofit also has to be assessed for its effects on other systems. An alteration made to improve ventilation, for example, can have implications for the building’s fire safety strategy (Guidelines § 7.6).

Safety after the work is complete

The Guidelines place scheduled inspections, maintenance plans and qualified practitioners at the centre of ongoing building safety. Section 4.32 of the Model Act assigns owners maintenance, inspection and record-keeping duties. If a commercial building relies on deployable flood barriers, the maintenance plan can say who tests them, how often and where faults are recorded. Years after installation, the owner needs evidence that the equipment still works and that the people responsible can operate it (Guidelines § 7.2; IBQC Model Building Act §§ 4.32-4.33).

Section 4.33 gives the local authority a corresponding duty to maintain a digital record, including permits, inspection reports and applicable manuals. The Guidelines explain why those records are worth keeping. A new owner or inspector needs to understand what was altered and which measures require continuing attention. For a high-risk building, a safety case explains how the systems work together. The owner’s manual tells the people managing the building how to look after them. A usable record gives the next inspector somewhere to start when the hazard or the use of the building changes again (IBQC Model Building Act § 4.33; Guidelines § 5; § 7.7;  Annexure 1).

The Guidelines also examine the carbon consequences of keeping, adapting or replacing an existing building once structural and fire safety have been assessed. For an office or apartment block that can be made safe, the comparison can include the emissions of replacement and the energy the upgraded building will consume in operation (Guidelines § 7.6(5)).

An order can establish who is responsible for the work. The means to pay for it are a separate question. The Guidelines discuss grants and low-interest loans as ways to encourage maintenance and energy upgrades. A jurisdiction could consider similar support for a justified safety retrofit where the cost would otherwise delay it. The availability of qualified contractors and inspectors will also affect how quickly the work can be done (Guidelines § 7.4).

Reviewing how the law works

Section 11.1 of the Model Act requires the minister to review the legislation every five years after it commences. I would use that review to examine actual performance. How many of the highest-risk buildings have been assessed? How many orders have been complied with and checked? Are repeat inspections finding that the equipment and procedures still work? Where an authority cannot answer those questions, ministers should find out whether it lacks information, people or powers. Each calls for a different remedy (IBQC Model Building Act § 11.1).

The Model Act gives authorities a way to act on evidence that comes to light after occupation. The Guidelines help establish what response the evidence justifies and how to tell whether it is still working years later. The test of building law is what it can do when a building outlives the assumptions on which it was approved.

About the author

Adjunct Professor Kim Lovegrove Hon D.Litt (WSU), MSE, RML is the inaugural Chair of the International Building Quality Centre. He prepared the drafting instructions for the IBQC Model Building Act, drafted by Gemma Varley, and co-authored the Good Practice Guidelines for Existing Buildings. He founded Lovegrove & Cotton and is the author of Doctrine of Proportionate Liability.

The views expressed in this article are my own. I write in a personal capacity and do not speak on behalf of any organisation with which I am affiliated.